Skills installed via Paseo desktop never updated after first run, so users were stuck on already-fixed skill content. On every launch, if the paseo base skill is present in `~/.agents/skills/`, sync each bundled skill (incl. `references/`) into agents, claude (via symlink/ junction), and codex — overwriting only files whose content differs. Files on disk that are not in the bundle are left alone; deprecation goes through tombstones (e.g. `paseo-orchestrate` redirects to `paseo-epic`). Also refreshes the bundled skill set: drops `paseo-chat`, adds `paseo-advisor` and `paseo-epic`, and turns `paseo-orchestrate` into a tombstone redirecting to `paseo-epic`. Adds a desktop test job to CI on Ubuntu and Windows so the junction/symlink path is exercised on both platforms.
286 lines
11 KiB
Markdown
286 lines
11 KiB
Markdown
---
|
||
name: paseo-epic
|
||
description: Heavy-ceremony orchestration for big work — research, planning, adversarial review, phased implementation, audit, delivery. Use when the user says "epic", "long task", "build this end to end", or wants a feature that runs all night.
|
||
user-invocable: true
|
||
argument-hint: "[--autopilot] [--worktree] [--no-grill] <task>"
|
||
---
|
||
|
||
# Paseo Epic
|
||
|
||
Heavy-ceremony orchestrator. Runs research → plan → implement → deliver as one resumable flow. The plan file at `~/.paseo/plans/<slug>.md` is the source of truth and survives compaction.
|
||
|
||
**User's request:** $ARGUMENTS
|
||
|
||
## Prerequisites
|
||
|
||
Read the **paseo** skill — it carries the surface (worktrees, agents, waiting, scheduling, preferences). Every agent you spawn reads it too.
|
||
|
||
The role and phase-type vocabulary lives in the roles reference shipped with this skill (`references/roles.md`).
|
||
|
||
## Modes
|
||
|
||
- **Default**: conversational. Grills, gates between phases, ask before deliver.
|
||
- `--autopilot`: no grills, no gates, run through deliver. For all-night work.
|
||
- `--worktree`: isolate the work in a new worktree.
|
||
- `--no-grill`: skip clarifying questions; keep gates.
|
||
|
||
## Hard rules
|
||
|
||
- **The plan file is the source of truth.** Re-read before every phase.
|
||
- **You are the only writer to the plan file.** Agents don't touch it.
|
||
- **Provider for every agent comes from orchestration preferences** — match the role's category.
|
||
- **Worktrees only via Paseo.** Never run `git worktree add` yourself.
|
||
- **Agents do not commit.** Delivery happens in the deliver phase.
|
||
- **Describe problems, not solutions.** Tell agents what's broken or needed; let them decide how. No specific line numbers or code snippets in prompts.
|
||
- **One agent per phase.** If a phase needs two, the planner split it wrong.
|
||
- **Don't poll agents.** Wait for them properly.
|
||
|
||
## Flow
|
||
|
||
```
|
||
[Worktree] → Research → [Grill] → Plan → Adversarial review → [Confirm] → Implement → Deliver
|
||
^^^^^^^ ^^^^^^^^^
|
||
default mode default mode
|
||
```
|
||
|
||
---
|
||
|
||
## 1. Research yourself
|
||
|
||
Read the code first. Grep the relevant area, read 2–4 key files, understand the current shape.
|
||
|
||
For ≥3 packages or architectural change, spawn one or two **researcher** agents — each scoped to one area. Provider from the `research` preference. Tell each researcher to read the roles reference for its mandate, read the area you've assigned, and report files / types / patterns / gotchas. No solutions. No edits.
|
||
|
||
State your own understanding to the user in 2–3 sentences.
|
||
|
||
## 2. Worktree (if `--worktree`)
|
||
|
||
Create a worktree via Paseo. Record the returned path and branch — they go into the plan frontmatter.
|
||
|
||
## 3. Grill (unless `--no-grill` or `--autopilot`)
|
||
|
||
Use `AskUserQuestion`. One at a time, recommended option stated, branches resolved depth-first. Never ask code-answerable questions. Every 3–4 questions, summarize resolved decisions.
|
||
|
||
Stop when branches are resolved or the user says "go".
|
||
|
||
## 4. Plan with adversarial review
|
||
|
||
### Spawn a planner
|
||
|
||
Persistent — keep iterating, do not archive after the first response. Provider from the `planning` preference.
|
||
|
||
Prompt it to:
|
||
|
||
- Read the roles reference for vocabulary.
|
||
- Take the objective and resolved decisions from grill as input.
|
||
- Think refactor-first: if existing code doesn't accommodate the change, plan the reshape before the feature. Phases like "wire up", "glue", "integrate" usually mean an upstream refactor was missed.
|
||
- Reply terse, one line per phase, in chat — not to disk.
|
||
|
||
### Challenge it
|
||
|
||
Send follow-ups. Push on edge cases, alternative orderings, smallest shippable slice, bolt-on phases that should be a refactor instead. Iterate until the plan is sharp.
|
||
|
||
### Spawn a plan-reviewer
|
||
|
||
Provider from the `planning` preference. Prompt it to:
|
||
|
||
- Read the roles reference.
|
||
- Read the planner's draft.
|
||
- Challenge it: bolt-ons, missing edge cases, over-engineering, wrong ordering, hidden dependencies. Push for alternatives. Force tradeoffs.
|
||
|
||
### Surface tradeoffs to the user
|
||
|
||
Never present raw planner output. Surface the choice:
|
||
|
||
> Planner wants A → B → C (working slice fastest, defers refactor).
|
||
> Reviewer argued for B → A → C (refactor first, slower but cleaner).
|
||
> Which?
|
||
|
||
Use `AskUserQuestion`. Iterate the planner if the user picks differently.
|
||
|
||
Archive the planner and plan-reviewer once the plan is locked.
|
||
|
||
## 5. Write the plan
|
||
|
||
Persist to `~/.paseo/plans/<slug>.md`:
|
||
|
||
```markdown
|
||
---
|
||
task: <slug>
|
||
status: not-started
|
||
worktree: <abs path or null>
|
||
branch: <branch or null>
|
||
pr: null
|
||
created: <ISO>
|
||
updated: <ISO>
|
||
---
|
||
|
||
# <Title>
|
||
|
||
## Objective
|
||
|
||
<one paragraph>
|
||
|
||
## Notes
|
||
|
||
- <ISO> orchestrator: <freeform>
|
||
|
||
## Phases
|
||
|
||
- [ ] **Phase 1** · <type> · <short name>
|
||
Acceptance: <one line>
|
||
|
||
- [ ] **Phase N** · gate · user smoke test
|
||
|
||
- [ ] **Phase N+1** · deliver · <commit | PR + merge | cherry-pick>
|
||
```
|
||
|
||
Phase types: `refactor`, `implement`, `verify`, `gate`, `deliver`. Verify variants written inline: `verify · unslop`, `verify · qa`, `verify · spec`, `verify · review`. See the roles reference.
|
||
|
||
Status markers: `[ ]` not started, `[~]` in progress, `[x]` done, `[!]` blocked.
|
||
|
||
## 6. Confirm (default mode)
|
||
|
||
Show the phase list (not the file contents — they'll read it). 2–3 sentences. Wait.
|
||
|
||
If `--autopilot`: skip.
|
||
|
||
---
|
||
|
||
## 7. Implement
|
||
|
||
Loop: find next undone phase → mark `[~]` → dispatch by type → wait → verify → mark `[x]` → repeat.
|
||
|
||
Stop when: a `gate` phase is reached, all phases `[x]`, or a phase is `[!]` blocked and you can't unblock it.
|
||
|
||
### Dispatch by phase type
|
||
|
||
#### refactor
|
||
|
||
Spawn a refactorer. Provider from `impl` (or `ui` for styling-only reshapes). cwd = the worktree path if set. Tell it to:
|
||
|
||
- Read the roles reference and load the skills it names.
|
||
- Read the plan file. Scope is Phase N; acceptance is pinned there.
|
||
- Reshape, not feature: behavior identical before and after. Existing tests stay green. Add a parity test if missing.
|
||
- When done: typecheck pass + relevant tests green. Do not commit. Do not update the plan.
|
||
|
||
#### implement
|
||
|
||
Spawn an impl agent. Provider from `impl` (or `ui` for styling-only). cwd = the worktree path if set. Tell it to:
|
||
|
||
- Read the roles reference and load the skills it names.
|
||
- Read the plan file. Scope is Phase N.
|
||
- Read any plan-relevant repo docs by path.
|
||
- TDD: failing test first, then make it pass.
|
||
- If the existing shape doesn't accommodate the change, push back instead of bolting on — a refactor phase should have come first.
|
||
- When done: typecheck + every test it touched green. Do not commit. Do not update the plan.
|
||
|
||
#### verify
|
||
|
||
Spawn an auditor matching the variant after `verify ·`. Provider from `audit`. The roles reference's variant table tells the auditor what to load and what to output. Read-only — no edits.
|
||
|
||
#### gate
|
||
|
||
No agent. Yield to the user.
|
||
|
||
1. Mark this phase `[x]`.
|
||
2. Compose handoff: worktree path (if set), what to test (next phase's acceptance, or this phase's Notes), how to resume (`/epic <slug>` once satisfied, or edit the plan first).
|
||
3. Exit cleanly. Don't launch the next phase. Don't poll.
|
||
|
||
#### deliver
|
||
|
||
Inline — see Section 8.
|
||
|
||
### Verifying agent output
|
||
|
||
For `refactor` and `implement`:
|
||
|
||
1. Read the agent's final activity.
|
||
2. Confirm acceptance: typecheck + tests green, what was touched matches the phase.
|
||
3. Wrong → send a follow-up to the same agent. Don't launch a new one for course-corrections.
|
||
4. OK → archive.
|
||
|
||
For `verify`:
|
||
|
||
- Green → mark the audited phase `[x]`, advance.
|
||
- Issues → append findings to Notes. Do not mark the phase done. Either send the impl agent the findings as new acceptance, or surface to the user if ambiguous.
|
||
|
||
### When the user interjects
|
||
|
||
- Feedback on a running agent → forward to it.
|
||
- Plan change → edit the plan file (add/remove/reorder), tell them what changed, continue.
|
||
- "Stop" / "kill" → archive running agents, summarize state, wait.
|
||
- New question → answer briefly, continue.
|
||
|
||
The plan file lets a fresh orchestrator pick up if the user kills you and reinvokes — write everything important to Notes immediately.
|
||
|
||
---
|
||
|
||
## 8. Deliver
|
||
|
||
Read frontmatter to choose mode:
|
||
|
||
```
|
||
worktree: null → Mode A: main commit
|
||
worktree: <path> → Mode B (PR) or Mode C (cherry-pick); ask if not specified
|
||
```
|
||
|
||
Never push to main directly. Never force-push without explicit permission. Never merge before CI is green. Archive worktrees via Paseo, never `git worktree remove`.
|
||
|
||
### Mode A — main commit
|
||
|
||
1. `git status` — confirm related changes.
|
||
2. `git diff` — review.
|
||
3. Draft a commit message: title <70 chars imperative; body 1–3 sentences why; match repo style (`git log --oneline -20`).
|
||
4. `git add <specific files>` — never `-A` or `.`.
|
||
5. `git commit -m "..."` (HEREDOC).
|
||
6. Update plan: `status: delivered`. Append a Notes line.
|
||
7. Tell user: hash + summary. Ask about push.
|
||
|
||
### Mode B — worktree → PR + merge
|
||
|
||
1. **Commit cleanly in the worktree.** One tidy commit per logical change. Match repo style.
|
||
2. **Rebase if behind main.** Spawn an agent that loads the rebase skill. Provider from `impl`. Tell it to rebase onto origin/main, resolve conflicts by intent (never blanket-accept one side), confirm typecheck and tests still pass, do not push.
|
||
3. **Push the branch** — `git -C <worktree> push -u origin <branch-from-frontmatter>`.
|
||
4. **Open the PR** — `gh pr create` with summary from plan Objective + Phases and test plan from acceptance lines. Capture URL → frontmatter `pr:`. Status → `pr-open`.
|
||
5. **Monitor CI.** Either watch directly (`gh pr checks <n> --watch`), or spawn a fix-build agent that loads the fix-build skill. Provider from `impl`. Tell it to drive the PR to green: when checks fail, read failure logs, fix, push, repeat. Don't merge — your call.
|
||
When green: append Notes, frontmatter `status: ready-to-merge`.
|
||
6. **Merge** when green — ask the user (`AskUserQuestion`: squash / rebase / merge / wait). Read repo convention from recent merged PRs (`gh pr list --state merged -L 5 --json mergeCommit,title`).
|
||
```bash
|
||
gh pr merge <n> --squash --delete-branch
|
||
```
|
||
7. **Archive the worktree** via Paseo. Frontmatter: `status: delivered`, `worktree: null`. Append a Notes line.
|
||
|
||
### Mode C — worktree → cherry-pick
|
||
|
||
1. Commit cleanly in the worktree (single clean commit per logical change).
|
||
2. From the main checkout (don't `cd`): `git cherry-pick <sha>`. For multiple: `git cherry-pick <oldest>..<newest>`.
|
||
3. Conflicts → stop, tell the user. Don't auto-resolve.
|
||
4. Archive the worktree via Paseo. Frontmatter: `status: delivered`, `worktree: null`. Ask about push.
|
||
|
||
---
|
||
|
||
## Resumability
|
||
|
||
The user can interrupt or kill at any phase. New invocation:
|
||
|
||
1. Find the plan by slug (or most recently updated).
|
||
2. Read frontmatter `status` and the first non-done phase.
|
||
3. Resume from the matching phase.
|
||
|
||
Mid-deliver resumption:
|
||
|
||
- `status: pr-open` + `pr: <url>` → resume CI monitoring.
|
||
- `status: ready-to-merge` → ask the user to merge again.
|
||
- `status: delivered` + `worktree: <path>` → worktree wasn't archived, do that.
|
||
|
||
## Failure modes
|
||
|
||
- Treating phases as a checklist to grind through. They're gates. Verify before advancing.
|
||
- Forgetting to set the agent's cwd to the worktree path in worktree mode.
|
||
- Re-explaining the plan to the user. They wrote it with you. Reference phases by number.
|
||
- Polling agents instead of waiting properly.
|
||
- Editing code yourself. You orchestrate. Agents implement.
|
||
- Marking `status: delivered` before the worktree is actually archived.
|
||
- Pushing to main directly.
|